Hydraulic Hoses and Wiring Done. Pict


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by Willy-N [72.171.192.118] on Tuesday, October 06, 2015 at 21:20:38 :

Got the Hoses done but need to replace the Ty/Wraps with stainless steel hose clamps since they weather and break. The #1 AWG Copper Cables will go under the frame into the back of the Side Tool Box thru a bushing. The gray control wire goes to the micro switch to open the power to the Control Buttons which operate the relays on the pump. I will put a strap to keep the hoses up on the frame later.



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com