Time for bed


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by Desoto61 [98.166.19.219] on Monday, August 03, 2015 at 21:12:34 :

Bed work anyway. Wrangled it into the garage and started cutting away all the bad metal, starting with the floor.

The plasma cutter is making itself my new favorite tool. Picked it up off CL for a really fair price. The floor looked to originally be 3/16" plate so it was slow going but still way faster than any other method.

Lots of work to do, but it's all mostly big heavy welding which is fast and forgiving.



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com