Replacing floors in a 75 crew cab


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by Ron in Indiana [184.19.10.223] on Saturday, July 16, 2011 at 16:16:37 :

I'm working on a 75 crew cab and it needed the drivers side floors replaced. I got a repair panel for the front which went in fine. The rear floor was also bad and after several suggestions I used a front floor pan today. This panel wasn't made for this but it covered the area that was rusted. I made a paper pattern which I used to outline the the patch. With a little massaging it fit fine. I just finished welding when I ran out of argon for the mig. With some brushable seam sealer the floors will solid and sealed again. Now to get on with the primer and sanding.



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com