Re: OT possible summer rigging project


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by Paul (in NY) [12.64.114.228] on Tuesday, January 25, 2011 at 09:12:00 :

In Reply to: OT possible summer rigging project posted by David Sherman [72.47.9.228] on Monday, January 24, 2011 at 23:36:55 :

Two things come to mind. The easiest is clear a small path for a stone boat, hire a guy with a team of mules. Have everything staged at the bottom and do all the moving in one day.
Probably the cheapest and quickest. The guy with the team of mules might even have a stone boat.

Buy the time you try to rig it for a winch up or a winch with a spar tree is going to be very expensive. Think of the cost to buy all that cable alone. I believe it would be cheaper to have a Helo do the move. Either way other than a stone boat an team, its going to be costly.

Paul



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com