Bed Progress continues


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by ccsammy [173.24.184.32] on Wednesday, November 24, 2010 at 11:45:22 :

The 2nd and 3rd series beds sides are here in western,ky in my shop. The 2nds I should have the top rail curled by the end of next week. I'm waiting for the tailgate hasp,latch,bracket to get riveted on the rear stake pockets like originals. We even went to the trouble to put the swege? marks in the hasp,latch,bracket or whatever you wish to call them.

Anyway these (2nd-3rd)series beds should be ready in 1-3 weeks or sooner.

This has been a painfull project, to the wallet and my health so i'm hoping I finish it with no regrets real soon..

Matt



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com